The Heart of Community
sports in deer lake
Whether you’re here for a thrilling game, a community event, or to book our versatile venue, we’re excited to have you with us.
Our Facility

hockey
The arena features a regulation-sized ice surface with seating for over 1000 people. We host minor hockey, senior hockey, and ice rentals, and in the off-season, ball hockey.

figure skating
We host the Deer Lake Skating Club, a Skate Canada-certified program, along with family skating, general skating, and preschool skating sessions throughout the week.

indoor walking track
The gymnasium features a 10-foot-wide walking track around its exterior, providing a spacious and safe environment for walking and jogging year-round.

conference room
State of the art conference room for all your meeting needs.

bowling
Humber River Lanes is a 6 lane, 5 pin bowling alley equipped with a large screen TV for watching sports in between strikes, bar service after 9PM and even glow bowling.

Swimming
Our aquatic facilities feature a 25 meter, 6 lane speed pool, a hot tub, 1 metre diving board and a children’s wading pool.

gymnasium
Two full sized basketball courts with 6 baskets, curtain to separate two spaces, volleyball/badminton net, telescopic bleachers.
gymnastics
Gracia Gymnastics, located on the lower level of the annex, offers a wide range of programs for all ages, providing a dynamic and inclusive environment for gymnastic enthusiasts of every skill level.
Parks and Recreation

Deer Lake Beach
Deer Lake Beach is a 2 KM stretch of sandy, freshwater shoreline located in the heart of town. The beach is maintained and regularly groomed by the Town of Deer Lake.

playgrounds
Deer Lake’s playgrounds offer inviting spaces for children to explore and play, surrounded by scenic beauty.

NAture and Multi-use trails
A variety of options await you in Deer Lake. You are invited to explore Deer Lake’s most popular walking trail The Humber Nature Trail and more.

Swimming hole
During summer months, enjoy a dip in the Humber River from our fenced-off swimming hole.
News and Updates

